Project Experience by Sector: Natural Gas Plants
- 500 MMSCFD Gas Plant Upgrade, including compression, slug catchers, and condensate stabilization system.
- Managed new gas processing and fractionation Facility with 28,400 BLPD capacity – Included Refrigerated lean oil Absorption plan, turbo expander plants, end products – ethane, propane, ISO butane, and natural gasoline.
- Design/Management of Propane cavern storage facility for 1,333,000 Bbl of Propane – included railway, truck, and pipeline facilities.
- Relocation and integration of 125 MMSCFD Turbo-Expander plant. Cryo plant required 6600 BHP of new compression
Project Experience by Sector Midstream- Pipelines/Terminals
- 36” OD x 400-mile CO2 pipeline with multiple booster stations utilizing multistage horizontal centrifugal pumps.
- 20” OD x 1440 psig Oil Transportation Pipeline in 150-foot (45 meters) water depth, including subsea assemblies.
- Oil Terminal upgrade for 200,000 BOPD, including tanks, LACTs, Blending, and metering.
- 12” x 24 miles Gasoline Pipeline between refinery and loading terminal, including truck loading racks.
- Refined Products Truck Loading Rack for 150,000 BPD refinery

