Skip to content
- Front-End Engineering Design (FEED) Studies
- AFE Estimated for the Overall Project Cost Including Installation
- Mature Production Field Re- development
- CO2 Capture Facilities, including COS (carbonyl sulfide) and H2S (hydrogen sulfide) Removal
- Pipeline Engineering, Compliance, and Project Management
- HYSY Process Modeling and Heat Load Studies
- Power Capacity Assessments and Heat Load Studies
- Cause and Effect Diagrams
- Process Equipment Design
- Facility 3D Modeling, Including Piping and Equipment Plans with Isometrics
- Structural and Civil Design
- Electrical and Instrumentation
- Procurement Services