Crude Oil Refineries


  • HOME
  • > Crude Oil Refineries

Project Experience by Sector : Refinery

 

  • Hydrocracker Unit Project – Multi-discipline engineering, design, drafting, project management, construction management and coordination of a new Hydrocracker Unit to increase the capacity of an existing refinery by an additional 50,000 BPD.
  • Crude / Vacuum Unit Expansion Project – Multi-discipline engineering, design, drafting, project management, construction management and coordination of a new 50,000 BPD Crude and Vacuum Unit.
  • Mobil Source Air Toxics (MSAT II) Project – Multi-discipline engineering, design, drafting, project management and construction coordination to install facilities to reduce Benzene content in gasoline to meet new environmental regulations.
  • MSCC Expansion Project – Multi-discipline engineering, design, drafting, project management, construction management and coordination of modifications to convert an existing Milli-Second Catalytic Cracker to Fluidized Catalytic Cracker to improve efficiency and quality of the unit.
  • Ultra-Low Sulfur Diesel Project – Multi-discipline engineering, design, drafting and project management of new facilities to reduce the sulfur content in road-grade diesel to meet government mandated sulfur emissions.
  • Sulfur Storage and Handling Expansion Project – Multi-discipline engineering, design, drafting and project management of facilities necessary to increase the sulfur storage and handling capacity of an existing refinery; project scope required design of a 10,000 barrel externally steam traced sulfur tank, sulfur shipping pumps, truck scales and loading racks.
  • ROSE (Residuum Oil Supercritical Extraction) Oil Heater Improvements Project – Multi-discipline engineering, design, drafting and project management of equipment necessary to improve the heating efficiency of the ROSE Oil Heater to reduce energy consumption of the unit; project scope required design of a new air pre-heater, induced and forced draft fans, air ducts and associated instrumentation and controls.
  • Asphalt Handling Expansion Project – Multi-discipline engineering, design, drafting and project management of facilities necessary to increase the asphalt off-loading of the refinery; project scope included installation of new API 610 asphalt transfer pumps, approximately 5,000 feet of 16” electrically heat traced piping from the tank farm to the loading docks, loading arm, associated instrumentation / controls and power requirements.