Oil Production Optimization

Challenge:

• High paraffin wells, with high water content

 

Process:

• Down hole chemical product injection

 

Crude Properties:

• API Gravity of 28o

• Pour Point of 100o F

• Paraffin content of 11%

• Asphaltenes content of 4%

 

Results:

• 100% increase in production leveling off to 50%

• The water cut in the oil that was produced was reduced by 95%

 

 

 

Heavy Crude Oil Production

Challenge:

• Highly viscous, extra heavy crude oil creating flow challenges.

 

Crude:

• API gravity of 7o to 8o

• Viscosity: 115,000 to 120,000 Cps@ 40o C

 

 

 

 

 

 

 

Process:

• Downhole injection and/or applied in conjunction with steam injection, as well as injection into pipelines and flow stations

 

Results:

• API gravity increased to 17o

• Viscosity reduction of 60%

Click on image for result chart.