Enhanced Oil Recovery

• Front – End Engineering Design (FEED Studies)

 

• AFE Estimated for Overall Project Cost Including Installation

 

• Mature Production Field Re- development

 

• Co2 Capture Facilities including COS (carbonyl sulfide) and H2S (hydrogen sulfide) Removal

 

• Pipeline Engineering, Compliance and Project Management

 

• HYSY Process Modeling and Heat Load Studies

 

• Power Capacity Assessments and Heat Load Studies

 

• Cause and Effect Diagrams

 

• Process Equipment Design

 

• Facility 3D Modeling, Including Piping and Equipment Plans with Isometrics

 

• Structural and Civil Design

 

• Electrical and Instrumentation

 

• Procurement Services